Skip to main content

Morristown Jr./Sr. High School recently completed a 14,400 square feet commercial roofing project. The endeavor involved removing the existing Duralast PVC membrane and insulation down to the tectum deck and replacing it with a new 60mil PVC membrane.

LEARN MORE

At River West Flats, a comprehensive commercial roofing project was successfully executed. The project encompassed the removal of the existing Firestone EPDM membrane and insulation down to the concrete deck. In its place, a new ballasted 60mil EPDM membrane and insulation were meticulously installed.

LEARN MORE

I-65 SOUTH COMMERCE PARK 2 stands as a testament to a successful commercial roofing project for a new construction warehouse spanning an impressive 1,119,000 square feet. The installation comprised two layers of insulation, a TPO membrane, and nearly 6,000 feet of metal coping, ensuring optimal durability and performance.

LEARN MORE

Bishop Chatard undertook a significant roofing project involving the complete removal of the existing EPDM roof and insulation, spanning 16,700 square feet. The installation included new tapered insulation with a TPO membrane, ensuring a robust and durable roofing system.

LEARN MORE

Yamaha successfully navigated a new construction project, expanding their existing warehouse by 110,000 square feet. The endeavor included an Elevate 10-year Red Shield Warranty with a 20-year membrane warranty, emphasizing a commitment to quality and longevity.

LEARN MORE

large roofing project

Gateway at Whiteland accomplished a new construction warehouse project covering 130,000 square feet. The installation featured two layers of insulation, a TPO membrane, and nearly 2,000 feet of metal coping, ensuring robust and reliable roofing. The project is backed by an Elevate 10-year Red Shield Warranty with a 20-year membrane warranty, highlighting the commitment to lasting quality.

LEARN MORE